Repair program

Equipment is planned for repair and is repaired on the basis of real technical status following preliminary inspections, expert valuations of status control and technical diagnostics according to regulatory and administrative documents. The primary aim of the repairs is restitution of equipment life by replacing key parts and components (aerial fuses for over-voltage limiters, OF incoming lines of transformers for incoming lines with RIP-isolation and stick-pedestal insulators of disconnect switches, defect porcelain isolators for polymer ones, worn-out overhead protection cable for a new one (model GTK, MZV-Ozh-NR), compression and bolted fittings for spiral hooping, defective wood for wood steeped in pollution-free antiseptic, etc.).

Overall repair plan for 2012 totaled RUR 1 304 079 thous. The completion of the plan totaled RUR 1 364 460 thous. (105%). Expenses incurred by the branches in terms of equipment totaled RUR thous.:

Target, RUR thous.Actual% completed
Permenergo454,711472,844104%
Sverdlovenergo479,166491,716103%
Chelyabenergo369,751399,271108%
IDGC of Urals1,304,0791,364,460105%

enlarge

Repair
Repair, RUR thous.
35-220
kV aerials
35-220
kV substations
0.4-20 kV
grids
Other
repair
TOTAL
Permenergo53,90973,021212,241133,673472,844
Sverdlovenergo77,68983,231194,755136,042491,716
Chelyabenergo56,35571,097174,00197,818399,271
IDGC of Urals187,953227,349580,997368,1601,364,460
Repair
Repair, RUR thous.
35-220
kV aerials
35-220
kV substations
0.4-20 kV
grids
Other
repair
TOTAL
Permenergo53,90973,021212,241133,673472,844
Sverdlovenergo77,68983,231194,755136,042491,716
Chelyabenergo56,35571,097174,00197,818399,271
IDGC of Urals187,953227,349580,997368,1601,364,460

Overall repair expenses totaled RUR 300 762 thous. (contracted form) and RUR 1 063 697 thous. (non-contracted form). Repair expenses in dynamics are as follows:

RUR 787 390 thous. (in 2009), RUR 1 228 575 thous. (in 2010), RUR 1 296 671 thous. (in 2011) and RUR 1 364 460 thous. (in 2012).