Grid development

The development of our grid complex is based on the regional schemes of grid development. The schemes were elaborated according to Government Decree #823 dd. 17.10.2009 on schemes and programs of energy sector perspective development, including development plans of all energy system participants and regional load forecasts. Development of manufacturing facilities shall facilitate the execution of federal programs, national projects, regional programs and regional development plans.

In 2012 the regional authorities prepared and approved programs and schemes of energy sector development in the Sverdlovsk region for 2013-2022 (Decree #652-PP dd. 14.06.2012), in the Perm region for 2013-2017 (Decree #246- p dd. 27.04.2012) and in the Chelyabinsk region for 2012-2016 (Decree #12/1 dd. 27.04.2012). Our short-term (for 2013) and long-term (for 2013-2018) investment programs were prepared and approved by the regional authorities.

According to the investment program the Company plans to spend RUR 48 391 mln on reconstruction and construction of 4 846 MVA and 9 437 km. We shall spend RUR 27 665 mln. (57%) on technical update and reconstruction, RUR 11 398 mln. on new construction, RUR 8 024 mln on technical connection and RUR 1 303 mln on acquisition of energy facilities.

The Perm region:

  • Construction of 110/10 kV substation Zaostrovka and 110 kV cable overhangs: to ensure power provision from Perm CHPP-9, connection of additional facilities and discharge of Zapadnaya substation due to residential construction in Kondratovo and Parkovyi communities in Perm
  • Construction of 110/10 kV substation Kochkino and double-circuit 110 kV cable to substation Kochkino: supply of Sanfrit-Trade, ООО, development of logistics and residential construction of the Perm district
  • Construction of 110/6 kV substation Krasnye Kazarmy and double-circuit 110 kV cable to substation Krasnye Kazarmy: supply of a new community in Perm
  • Construction of 110/10 kV substation Raduga and double-circuit 110 kV cable to substation Raduga: supply of a land plot planned for real estate development (179 Quarter in Perm), liquidation of power deficit in the central part of Perm
  • Construction of 110/10 kV substation Tyurino and double-circuit 110 kV cable: supply of an agroindustrial complex in the Perm district
  • Construction of 110/10/6 kV substation Zvezda: supply of a shopping mall in the Perm district, residential development

The Sverdlovsk region:

  • Overhaul of 110/35/10 kV substation Sverdlovskaya: increased reliable supply of consumers in Uralmash and Elmash (Ekaterinburg)
  • Reconstruction of 110 kV aerial overhangs and reconstruction of 220/110 kV substation Kalininskaya and 110 kV aerial line Kalininskaya-Sibirskaya-2: decreased power deficit in Ekaterinburg power center
  • Reconstruction of 110/35/6 kV substation Polevskaya: decreased power deficit in the Polevskoy load node
  • Overhaul of 110/35/6 kV substation Pyatiletka: increased reliable supply of consumers located in Verkhnyaya Salda, new connections in Titanium Valley economic zone
  • Overhaul of 110/10 kV substation Ferrosplav: power supply contract implementation and commissioning of a new 420 MV PGU (Serovskaya GRES)

The Chelyabinsk region:

  • Reconstruction of 110 kV aerial line Zlatoust-Taganai: increased reliable supply of consumers located in Zlatoust-Kropachevo load node
  • Construction of 110 kV cable line ChGRES-Massivnaya: arrangement of the second power source for the Kurchatovskyi and Sosnovskyi communities (Chelyabinsk), optimization of 110 kV network
  • 110 kV cable line PS Vostochnaya – PS Tsentralnaya, 110 kV cable line PS Vostochnaya – PS Tsentralnaya, reconstruction of 110 kV substation Traktorozavodskaya and conversion of 35kV substation Tsentralnaya into 110 kV, 110 kV cable line PS TZP2 – PS Traktorozavodskaya, TES-2 - TZP-2, reconstruction of 110/35/6 kV substation Vostochnaya: optimization of 110 kV network in Chelyabinsk, expansion of transformer capacity on substations Vostochnaya, Strommashina, Tsentralnaya
  • Construction of 110 kV substation Arkhipovskaya:decrease of power deficit in the North load node of the Chelyabinsk region, connection of new consumers (low-rise residential development)
  • Reconstruction of 110 kV substation Kremenkul: increased reliable supply of consumers located in the Sosnovskyi load node, expansion of capacities for new connections, including sites owned by the federal fund facilitating residential construction development
  • Reconstruction of 110 kV substation Miasskaya: increased reliable supply of consumers, expansion of capacities for new connections in the Krasnoarmeiskyi district
  • Reconstruction of 110 kV substation Pervomayskaya: connection of small generation facilities designed to supply a manufacturing facility owned by Asbestotsement, OAO

Limited finances impede the planning of all required activities. Besides, liquidation of bottle necks and improvement of situation in the abovementioned load nodes demands construction and reconstruction of grid facilities owned by FSK. In 2013 we plan to enter into more close cooperation and constructive dialogue with MES of Urals branch of FSK and regional RDUs on complex and efficient development of the networks on the service area of IDGC of Urals, OAO.